Answer: The project is located on the company's clear-cut registered (freehold) land with an approach of more than 600 feet on the northern side of the Dhaka-Savar highway at Aminbazar Union near Dhaka and on the east side of its own main road 80 feet wide from the said highway. Mouza-North Kaundia, Union Parishad-Aminbazar, Upazila- Savar, District- Dhaka.
Answer: The project is initially being constructed with approximately 166 three, four, and five katha duplex/triplex houses in Phase-1 called 'Riviera Parkcity' on the company's own land of approximately 100 bighas. Later, in three more phases (Phase-II, Phase-III, and Phase-IV), approximately 334 houses are planned to be connected, with a clubhouse and improved community facilities for a total of approximately 500 families.
Answer: The project has been established by utilizing all the facilities of the sister concern of this company (Pinkcity Food and Beverage Industries Ltd.), and the necessary clearances have already been collected from RAJUK, Environment, WASA, TITAS, REB, etc. Riviera Parkcity (Pvt) Ltd. is registered as an exclusive residential housing project by RAJUK with registration No. RAJUK/RD-0134, dated 11.05.2015, and further proceedings will be conducted as per RAJUK instructions.
Answer: The project has a 500 KW electrical sub-station and distribution line installed by REB (REB Clearance No- Baiuprabip/Pir:/27.01.0000.003. 01.121.12.799/1), Environmental Clearance by the Department of Environment (Memo No.- 30.26.72.3.09276.010309/Chard-19, Clearance Letter No-46.11.00.00.Gh-4/0834/Podor/Gab/12/850/1212), TITAS Departmental Approval No-3150043, and other relevant approvals have been collected by WASA.
Answer: The project involves several developer companies, land management consortiums, engineering, and architectural firms of international repute. Notable among them are the International New Town Institute of the Netherlands, Kevin de Gray Consulting Inc. of the United States, the renowned principal architect of the Twin Towers of Malaysia, A.R. Joynal, and Brazil's well-known architect Angela de Bucci. The project is coordinated by Riviera Parkcity (Pvt) Ltd. as the anchor company, which brings together several organizations to implement the project.
Answer: By December 2024, approximately 50 to 60 houses in Phase-I of the project are planned to be handed over. Although the civil construction work of almost all the houses in Road No. 1 located in the block of Phase-1 has progressed significantly and will be completed before December this year, Inshallah. The handover of Phase-I houses is planned by December 2026.
Answer: Yes, it is possible to provide a clear registry now. The chain of documents and the 'This Property Belongs To' sample book for each house will be available at the sales desk.
Answer: You need to select a house from available options in the project, decide the terms and pricing, and sign a purchasing agreement. After completing the documentation and making an initial payment, the purchase process will continue smoothly.
Answer: The community facilities, including the clubhouse, will be ready after the handover of the first phase of houses. The planned date for this facility is set to be ready within a year of your move-in date. The developers are ensuring that all amenities will be functional by then.
Answer: All kinds of civic amenities will be provided. All the civic amenities required as a gated community are present in Riviera Park City. An elementary school and playground adjacent to the school, a clubhouse, utility store, etc. are present inside the Park City.
Answer: Riviera Park City is controlled by the electronic gated community system Secured Garden Homes.
Answer: In order to preserve the architectural and natural beauty of Riviera Park City Township, the management committee has a cleaning system for the main and internal roads, footpaths, parks, sewage and drainage, landscaping, etc., by its own staff. However, in this case, the customers will have to pay a service charge at a monthly rate (conditions apply).
Answer: The land cost of a house of type PX-5 (I) in Riviera Park City is 2.34 crores (average cost of each katha is 46.80 lakhs taka, five kathas of developed land on which the house is built) and the building cost is 1.48 crores (total construction cost of a three-storey house of 3,292 sq ft with complete finishing) which includes boundary wall, entrance gate, electricity, water, and sewage system of the concerned unit.
Answer: Reinforced Cement Concrete (RCC) Deformed Bar (G- 60/62), Portland Cement, Brick Chips, Sylhet and Local Sand, Bricks, and other aggregates, etc.